Quantum Data Energy PLC

Research Quantum Data Energy PLC (QDE.L) with Bullrun company financials, valuation charts, model signals, and historical stock context.

Key Metrics

Five-year financial history

YearRevenueNet incomeFree cash flowGross marginDiluted EPSCashTotal debtEquity
FY2025GBP 1.63M-GBP 1.52M-GBP 1.09M30.5%0GBP 1.44MGBP 3.42MGBP 5.21M
FY2024GBP 737.16K-GBP 1.10M-GBP 2.87M40.1%-0.13GBP 146.45KGBP 4.58MGBP 2.83M
FY2023GBP 341.21K-GBP 3.54M-GBP 727.13K34.4%-0.6GBP 252GBP 2.02MGBP 3.68M
FY2022GBP 1.04M-GBP 2.73M-GBP 1.70M24.9%-0.54GBP 132.18KGBP 2.18MGBP 6.18M

About Quantum Data Energy PLC

Quantum Data Energy PLC engages in the development and production of power generation projects in the United Kingdom. It operates Pyebridge project, a 9 MW gas-powered reserve power (RP) site located in Derbyshire; Bordesley project, a 5 MW gas-powered RP site located in Central Birmingham; Rochdale Project, a 4.4 MW a 4.4 MW gas-powered flexible-power plant located in West Midlands; the Hindlip project, a 7.5 MW capacity gas-powered standby generation facility located in Worcester;

Related stock research

Other Utilities stocks

Frequently asked questions

What does Quantum Data Energy PLC do?

Quantum Data Energy PLC engages in the development and production of power generation projects in the United Kingdom. It operates Pyebridge project, a 9 MW gas-powered reserve power (RP) site located in Derbyshire; Bordesley project, a 5 MW gas-powered RP site located in Central Birmingham; Rochdale Project, a 4.4 MW a 4.4 MW gas-powered flexible-power plant located in West Midlands; the Hindlip project, a 7.5 MW capacity gas-powered standby generation facility located in Worcester; and the Stather, a 2.4 MW gas-powered reserve power plant located in Scunthorpe, Lincolnshire.